Monday, February 7, 2022

First Flotation Test


 This is an initial test with 7kg of lead shot. The waterline, marked by the bottom edge of the blue tape, is still well above the actual water. Although there is obviously much more to be added to the boat, in the way of winches, batteries and rigging etc. 

Rudder Control








 

Friday, February 4, 2022

Shrouds




A touch of soft solder was used to fix the nut in place and then the remaining bolt was trimmed off. This provides a reasonably realistic representation of the real rigging system, this also means the shrouds can be eased and then unhooked so the mast can be removed.


 

Tuesday, February 1, 2022

The Deck


 The first piece of deck was added. First a card template was made and then the deck was cut from 1.5mm plywood. This was glued in place with Titebond III. Once the deck has been completed in the plywood, it will then be covered with planking, giving a total thickness of 3mm.

Templates for the rest of the deck, from which plywood will cut from.





The pictures below show the 1.5mm thick plywood pieces cut to size. To be glued later and then the planking can be added. Initially an edging and uprights that represent the tops of the frames. After that the king plank, which will be 15 mm wide and then the other planks that are 10mm wide.